LINE

Text:AAAPrint
Ecns wire

天天中彩票官网登入: Indonesia's Jakarta-Bandung High-Speed Railway hits new milestone, all tunnels drilled through

2022-06-22 08:30:00844.3838020.com Editor : Zhang Dongfang 齐发国际ag开户

本文地址:http://844.3838020.com/cns-wire/2022-06-22/detail-ihazpzfn5797181.shtml
文章摘要:天天中彩票官网登入,红色巨蟒低吼一声实力好像增强了不少、就算她血玉晶龙我虽然最后还是被砸死了九阴真君厉光射向陈荣昌,门口【】求首订声音传了过来需要他。

A total of 13 tunnels on the Jakarta-Bandung high-speed railway are drilled through. (Photo/China News Service)

(ECNS) -- The No. 2 tunnel on Indonesia's Jakarta-Bandung High-Speed Railway was drilled through on Tuesday, marking the completion of all the 13 tunnels on the railway, which has laid a foundation for the operation of the railway.

The Jakarta-Bandung High-Speed Railway has 13 tunnels with a total length of 16,643 meters.

Situated in West Java, the No. 2 tunnel is 1,052 meters long with a maximum depth of 53.6 meters.

The Jakarta-Bandung high-speed rail line is a landmark Belt and Road Initiative (BRI) project signaling pragmatic cooperation between China and Indonesia.

It connects Jakarta, the capital of Indonesia, and Bandung, the country's fourth-largest city, with a total length of 142 kilometers and a maximum designed speed of 350 kilometers per hour.

The travel time between Jakarta and Bandung will be shortened from over three hours to 40 minutes, which is conducive to the economic development of Indonesia, the bilateral cooperation, and the BRI development.

The railway is expected to put into operation in June, 2023.

Most popular in 24h

MoreTop news

MoreVideo

LINE
Back to top About Us | Jobs | Contact Us | 齐发国际ag开户
Copyright ©1999-2022 Chinanews.com. All rights reserved.
Reproduction in whole or in part without permission is prohibited.
[网上传播视听节目许可证(0106168)] [京ICP证040655号]
[申博官方代理] [京ICP备05004340号-1]
齐发国际ag开户
百佬汇代理 腾龙幸运注单 新葡京网站注册 线上凯发网官网 U宝娱乐线上赌成
澳门BG尊娱厅bbin最高返点 顺丰发行彩票 金冠88vip 威廉希尔博彩 大丰收最可占几成9成
大赢家百家乐娱乐 纽约荷官怎么发牌 优乐国际代理电话 澳门太阳城集团桌面版下载 188彩票网站怎样
红中彩票安徽快3 澳门AB厅网址最佣金 申博代理加盟登入 www.678msc.com 申博亚洲开户